1. <nobr id="bwoat"></nobr>

      1. <track id="bwoat"><div id="bwoat"></div></track>

        
        
        <bdo id="bwoat"></bdo>
      2. <bdo id="bwoat"></bdo>
          Welcome to xxxxxx Co., Ltd
          CN EN

          New pipeline Manufacturer & amp; Customized overall solution

          Integrated service provider of fluid pipeline system engineering

          Service hotline:

          400-000-0000

          + Wechat number:wechat number

          Add wechat friends to learn more about products.

          Your location: Home > 產品展示 > PPR water supply pipe

          PPR water supply pipe 001

          During loading and unloading, the materials shall be protected from damage. It is strictly prohibited to push the grille pipe directly from the carriage or higher place. The materials should be transported directly from the transfer station to the construction site. If it is necessary to set up a temporary pipe stacking site, the temporary pipe stacking site shall be selected by the construction u

          National hotline

          13893689311

          Details
          During loading and unloading, the materials shall be protected from damage. It is strictly prohibited to push the grille pipe directly from the carriage or higher place. The materials should be transported directly from the transfer station to the construction site. If it is necessary to set up a temporary pipe stacking site, the temporary pipe stacking site shall be selected by the construction unit. The pipe stacking site shall be set at a place convenient for construction as far as possible, and the site shall be flat and compacted.
          国产综合精品一区二区三区,日本国产欧美在线专区,国产精品综合色区小说,久久久久夜色精品国产明星

          1. <nobr id="bwoat"></nobr>

            1. <track id="bwoat"><div id="bwoat"></div></track>

              
              
              <bdo id="bwoat"></bdo>
            2. <bdo id="bwoat"></bdo>